Sunday, October 25, 2009
Class Divided into Groups
Following the design meeting held between Professor Everhart, two other architects and our class, we were split into groups so that project assignments could be distributed among us. The seven groups are as follows: Project Management, Marketing and Fundraising, Engineering, Physical Models and Mock-ups, Digital Modeling and Documentation, Estimating and Budgeting, and Graphics and Blog. The responsibilities of the groups range from keeping all of the groups on task and organized, to working with local vendors to raise money for the project, to designing a renewable energy system to be used on the stage, to building scaled models, computer models, and everything in between. Basically, our class is taking this stage from concept to design to construction. All of the groups listed above are currently putting in as much work as they can so that the design phase can flow smoothly into construction. Stay tuned for more...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment